Kinetic Industrial

Kinetic Industrial

Excavation Checklist Wizard

Digitize the physical excavation checklist before mechanical digging begins.

← Return to Employee Portal

1. General & Ticket Details

Is the Line Locate current and have all utilities been marked? *

Are extents of excavation clearly identified? *

2. Excavation Safety Requirements

1.Expectations to not work under suspended loads communicated?

2.Hazards associated with falling material during loading/unloading communicated?

3.Safeguards established regarding distance between excavation and equipment?

4.If "rock teeth" use planned, approved by supervisor of Authorized Employee?

5.Excavation by mechanical means limited to distances outside tolerance zones?

6.Fencing and barricade requirements specified?

7.Potential hazards (trees, boulders, overhead/underground utilities) managed?

8.Walkways 6ft+ in depth equipped with guardrails?

9.Environmental compliance activities understood and communicated?

3. Stability of Adjacent Structures

1.Stability of adjoining buildings, walls, or other structures endangered?

2.Excavation below base/footing of foundation or retaining wall posing hazard?

3.Sidewalk, pavement, or appurtenant structure undermined?

Sign-off

Sign below to verify this excavation checklist. A signature is required before submission and PDF download.

Sign below with your finger or stylus. Shown on the exported PDF next to your name.